Checking Slide Installation Status And Fixing - NEC Express5800 140He User Manual

Server
Table of Contents

Advertisement

G-28

Checking Slide Installation Status and Fixing

1.
Push the server into the rack once to check the installation position.
NOTE:
Make sure that the four screw holes at the upper left and right sides on the front of
the server are fit to the core nuts. If the four positions are not fit at all, the slide rail
assembly or the core nuts may be installed incorrectly. If so, the adjacent units cannot be
installed without clearance. Confirm the installation positions and make the reinstallation
from the first step.
2.
Pull out or push the server into the rack for several times to confirm that the slides move smoothly.
3.
Connect the power cords and all interface cables to the server.
IMPORTANT:
or loose when sliding the server.
4.
Fix the server to the rack with four screws (B) and four washers (A) after making sure the positions of core
nuts.
When routing the cable, pay attention that the cables are not caught, bent,

Advertisement

Table of Contents
loading

Table of Contents