Fujitsu PRIMERGY RX600 S3 Options Manual page 67

Hide thumbs Also See for PRIMERGY RX600 S3:
Table of Contents

Advertisement

Battery for the RoMB controller
Installing the battery (BBU)
Figure 46: Fastening the battery holder and routing the connection cable
Ê Fasten the battery holder in the recesses provided in the side of the housing.
Ê Route the connection cable through the opening in the ventilation foil (see
circle in figure above).
Options Guide RX600 S3
67
U41640-J-Z156-2-76

Advertisement

Table of Contents
loading

Table of Contents