Rinnai Arriva Operation And Installation Manual page 28

Hide thumbs Also See for Arriva:
Table of Contents

Advertisement

Flueing - Types of Flue Installations
Refer Flue Installation manual provided with the Arriva Direct and Adaption Flue kits
for detailed flue installation instructions.
NOTE
Flue is run direct from appliance to the termination point either in a
Direct flueing
horizontal or vertical direction.
Flue is run offset from appliance to a horizontal termination point to avoid
Extended
obstructions.
offset
horizontal
flueing
Flue is run offset from appliance to a vertical termination point to avoid
Extended
obstructions.
offset vertical
flueing
Flue is run below floor level to an external termination point. Flue must
Down and out
terminate 300 mm above the ground.
offset flueing
rinnai new Zealand Limited
Rear Flueing
Sideways Flueing
Heater
Heater
Rear Flueing
Heater
Heater
Rear Down & Out
Heater
Under Floor
Vertical Flueing
Heater
Sideways Flueing
Heater
Heater
Sideways Flueing
Heater
Under Floor
Arriva Operation and Installation Manual: 10343-E
28
05-10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents