    Installation guide Arriva 752 Models: RHFE752ETRN/RHFE752ETRL...
  • Page 2 Important: Appliance must be installed with a Rinnai approved flue system. This appliance shall be installed in accordance with: - Manufacturer’s installation instructions - AS/NZS 5601.1 - Local regulations and municipal building codes Installation, servicing and repair shall be carried out only by authorised personnel.
  • Page 3: Table Of Contents

    Specification ............ 4 Clearances ............5 Location ............6 Gas connection ..........7 Flueing options ..........8 Flueing guidelines ........... 9 Arriva flue components ........10 Flue transition ..........12 Installation ............13 Installing the burn media ........ 14 Commissioning ..........15 Setting the air guide vane........
  • Page 4: Specification

    Power flue, inner - 50 mm, Gas type = NG or LPG outer - 78~80 mm. Appliance must be Safety devices installed with a Rinnai flue system. Flame failure sensing system, pressure relief, overheat safety switch, air Inbuilt convector ceramic log space heater Gas connection...
  • Page 5: Clearances

    Clearances The clearances listed below are minimum clearances unless otherwise stated. Clearances around the heater 250 mm The appliance must not be installed where curtains or other combustible materials (coffee tables, couches etc.) could come into contact with the heater. In some cases curtains may need restraining.
  • Page 6: Location

    Location The main points governing location are flueing and warm air distribution. The Rinnai Arriva has a cool outer casing, it can be installed into an existing masonry, or decorative fireplace. Enclosure dimensions The heater must be positioned on a flat level surface that allows free movement of the appliance.
  • Page 7: Gas Connection

    Gas connection Gas pipe sizing must consider the gas input to this appliance, as well as other gas appliances in the premises. The gas supply termination is inside the heater, and enters from the rear right hand side of the appliance. To ensure correct positioning terminate the gas supply so it is 80 mm in from the front face of...
  • Page 8: Flueing Options

    Flueing options Sideways through wall Rear external wall Vertical Through wall False wall False wall False wall Flue components: A flue components: A flue components: Flue components: - Adaption flue (ASPKIT03) - Direct A flue (R2731), or - Adaption flue (ASPKIT03) - Direct flue (ASPDFK) - Coaxial pipe (ESPIPE900) - Direct B flue (R2732), or...
  • Page 9: Flueing Guidelines

    The flue cowl should have a installation. 500 mm clearance from any part of the building. This also The Rinnai Arriva must be applies to steeped and pitched installed with an approved roofs which should be clear of Rinnai flue system. Approved the ridge line.
  • Page 10: Arriva Flue Components

    Arriva flue components Internal wall plate Externall wall plate Flue terminal Flue transition Silicon grease 22mm Direct A flue kit Direct B flue kit Direct flue kit Code = R2731 Code = R2732 Code = ASPDFK For use in walls 115-240 mm thick— For use in walls 240-400 mm thick—...
  • Page 11 Vertical terminal Condensate trap 45° flue bends x 2 Code = ESROOFCOWL Code = ESCONDK Code = ESBEND Roof cowl and connecting pipe For the small number of vertical Two 45° bends used to facilitate (960 mm installed) for termination of through the wall flue installations, between horizontal, vertical, and flue—can be cut to size.
  • Page 12: Flue Transition

    Flue transition The flue transition provides a connection between the flue system and the heater’s flue spigot and air intake. For all flueing installations, except horizontal direct flueing, the flue transition is counted as a 90 ° bend. The flue transition requires a brackets supplied.
  • Page 13: Installation

    Arriva 752 installation Isolate the electrical supply before removing any panels. WARNING 1. Connect to gas pipe tie supplied in accessory Side Screws panel pack with the remote. a. Remove the right hand side access panel by removing e. Push appliance into the four retaining screws.
  • Page 14: Installing The Burn Media

    Installing the burn media Remove combustion chamber glass Retaining screws Before the burn media can be installed the combustion chamber glass panel needs to be removed. Combustion 1. Remove the two retaining screws that secure the chamber glass combustion chamber glass panel to the heater engine. 2.
  • Page 15: Commissioning

    Commissioning The gas pressures of the appliance are factory preset for direct flue installations and will normally not require adjustment. For all Arriva flueing EXCEPT direct flueing, the appliance must be down rated as per the instructions on the commissioning sheet. The commissioning sheet is located in a plastic pouch behind the removable access panel on the right edge of...
  • Page 16: Panel Installation

    Panel installation The fascia of the Arriva 752 is fully assembled and packaged in a separate carton. Always inspect the glass for any chip or obvious sign of damage before installation. Care is required when handling the front fascia—no sudden impact or excess force should be applied.
  • Page 17: Flame Pattern

    If the appliance cannot be made to perform correctly please contact Rinnai. Arriva 752 Installation Guide: 12218-D 04-14 | 17...
  • Page 18: Installation Checklist

    Installation checklist Complete the installation checklist in the customer operation guide, and make sure you leave the guide with the customer. Explain to the customer about the use and care of the unit, and ensure they understand the instructions and operation of the appliance. 18 | Arriva 752 Installation Guide: 12218-D 04-14...
  • Page 19: Wiring Diagram

    Wiring diagram (12258-A) Part of commissioning sheet Wiring Diagram RHFE752 CONTROL DISPLAY UNIT 1 2 3 4 5 6 r bl OH.TH 2 blk blk OH.TH 1 F (3A) gr/y R.TH AC 230-240V gr/y 6 5 4 4 3 2 1 3 2 1 bl w y bk pl gy or y or...