Level System Synchronization

The HydroRanger 200 CANNOT be synchronized with the HydroRanger.
Note:
When using multiple ultrasonic level monitors, be sure to run the transducer cables in
separate grounded metal conduits.
When separate conduits are not possible, synchronize the level monitors so that no unit
transmits while another is waiting for echo reception.
Synchronizing with another HydroRanger 200, or other Siemens Milltronics
instruments (DPL+, SPL, XPL+, LU01, LU02, LU10, LUC500, Hydro+,
EnviroRanger, MiniRanger):
Mount the level monitors together in one cabinet
Use a common power (mains) supply and ground (earth) for all units
Interconnect the SYNC terminals of all level monitors
Set parameter
Contact Siemens Milltronics or your local distributor. Go to
www.siemens.com/processautomation.

Power

Important!
Before applying power to the HydroRanger 200 for the first time, ensure any
connected alarm/control equipment is disabled until satisfactory system operation
and performance is verified.
Notes for AC power connections
The equipment must be protected by a 15 A fuse, or circuit breaker in the
building installation.
A circuit breaker or switch in the building installation, marked as the disconnect
switch, must be in close proximity to the equipment and within easy reach of the
operator.
Note: Make sure unit is
connected to a
reliable ground.
7ML19985FC03
Other Siemens
Milltronics Transceiver
P726 Level System Sync
Ground
HydroRanger 200 – INSTRUCTION MANUAL
HydroRanger 200
on page 190.
GND
L1
L2/N
Page 19