Concluding Steps - Fujitsu PRIMERGY RX100 S8 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX100 S8:
Table of Contents

Advertisement

Figure 174: Connecting the cables (A)
Ê Connect the front panel cable (1) and the front USB cable (2) to the system
board
Figure 175: Connecting the cables (B)
Ê If applicable, connect the front VGA cable to the system board.

13.2.4 Concluding steps

"Reassembling" on page 52
Ê
"Connecting the server to the mains" on page 55
Ê
"Enabling SVOM boot watchdog functionality" on page 78
Ê
"Using the Chassis ID Prom Tool" on page 87
Ê
"Switching on the server" on page 57
Ê
"Verifying system information backup / restore" on page 73
Ê
"Enabling BitLocker functionality" on page 84
Ê
RX100 S8
Upgrade and Maintenance Manual
Front panel
237

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents