Concluding Steps - Fujitsu PRIMERGY RX100 S8 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX100 S8:
Table of Contents

Advertisement

Figure 81: Connecting the cables to the 3.5-inch HDD backplane
Ê Connect the following cables to the HDD backplane:
– SAS/SATA data cable:
(1), (2), (4), (5) to connectors "P1", "P2", "P3", "P4" according to the
length
plug P6 to connector "SGPIO"
– (3) power cable to connector "PWR"
– (6) OOB cable to connector "SMBus" (if applicable)
For the cable plan see section
7.3.5.4

Concluding steps

Ê Insert all HDD modules, see section
page
141.
I
Make sure that you reinstall the HDD module in the bay it was located
before the HDD backplane replacement.
"Reassembling" on page 52
Ê
"Connecting the server to the mains" on page 55
Ê
"Switching on the server" on page 57
Ê
RX100 S8
"Cabling" on page
Upgrade and Maintenance Manual
Hard disk drives / solid state drives
272.
"Installing a 3.5-inch HDD module" on
147

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents