1.6 Overview of Installation and Setup Tasks
Setup tasks described in this manual
This manual contains instructions for all installation and operation tasks relating to the
Analyzer/Controller. (Instructions for installing and using the cells are provided in the manuals
supplied with the cells.) Table 1-3 provides an overview of the Analyzer/Controller installation
tasks, as well as providing references to the relevant sections of the manual.
Table 1-4 Overview of Analyzer/Controller Installation Tasks
Sequence
1
2
3
4
5
6
7
8
9
10
7/99
9782 Series Conductivity/Resistivity Analyzer/Controller - Operator's Manual
Consider the environmental and electrical specs when
selecting a site to install the Analyzer/Controller.
Unpack, inspect and mount the unit.
Check tag to confirm that unit is compatible with the voltage at
your site.
Install power wiring.
Perform I/O setup and configure the software to implement
your control strategy.
Wire inputs and outputs to match I/O setup in Step 5.
If AutoClean will be used, install necessary piping and valves.
Configure a tagname or other text string to be displayed at the
top of the screens showing real-time process values.
To limit access to I/O setup, configuration, calibration, and
maintenance functions, enter a password.
Display model number stored in memory and software version
number. Note these for future reference. (If you call for
technical assistance, you will need this information.)
Task
Introduction
Section
2
3
4
4
5
6
7
10
10
10
1-17