Chapter 2 Installation - Allied Telesis AT-9410GB Installation Manual

Table of Contents

Advertisement

Chapter 2
Installation
This chapter contains the installation procedures for the switch. This
chapter contains the following sections:
Installation Safety Precautions
G
Selecting a Site for the Switch
G
Required Cables
G
Unpacking the Switch
G
Installing the Switch on a Desktop
G
Installing the Switch in a Rack
G
Installing a GBIC Expansion Module
G
Cabling the Switch
G
Powering on the Switch
G
Starting a Local Management Session
G
Warranty Registration
G
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents