Selecting A Site For The Switch - Allied Telesis AT-9410GB Installation Manual

Table of Contents

Advertisement

Installation

Selecting a Site for the Switch

42
Observe the following requirements when choosing a site for your
switch:
If you plan to install the switch in an equipment rack, check to be
G
sure that the rack is safely secured and that it will not tip over.
Devices in a rack should be installed starting at the bottom, with
the heavier devices near the bottom of the rack.
If you are installing the switch on a table, be sure that the table is
G
level and secure.
The power outlet for the switch should be located near the unit
G
and should be easily accessible.
The site should provide for easy access to the ports on the front of
G
the switch. This will make it easy for you to connect and
disconnect cables, as well as view the switch's LEDs.
To allow proper cooling of the switch, air flow around the unit and
G
through its vents on the side and rear should not be restricted.
Do not place objects on top of the switch.
G
Do not expose the switch to moisture or water.
G
Make sure that the site is a dust-free environment.
G
You should use dedicated power circuits or power conditioners to
G
supply reliable electrical power to the network devices.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents