Connecting The Media Gateway To The Main Distribution Frame; Equipment Room Cabling Labels - Avaya S8700 Installation Instructions Manual

Installing an avaya s8700 media server with an avaya g650 media gateway
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

Connecting the media gateway to the main distribution
frame
Once the main distribution frame (MDF) is installed and wired, you must connect the media gateways to
the MDF.
Run excess cables on an upper cable ladder (if the MDF connectors are on top) or route them through a
cable slack manager that is placed next to the MDF. For more information, see
Managers
on page 147.
This section has information about

Equipment room cabling labels

Cable routing guidelines
Trunk cables among network interface, sneak fuse panel, and media gateway
And procedures for:
Installing cables between media gateway and main distribution frame
Installing connector cables between auxiliary cabinet (if used) and main distribution frame
page 154
Equipment room cabling labels
The purple port label shown in
both ends of the 25-pair cables connecting to the trunk/auxiliary field and/or distribution field.
Figure 52: Equipment room cabling labels
Figure notes
1
Purple Label (Port Cable)
2
Blue/Yellow Label (Building and
Floor)
Installing the Avaya S8700 Media Server with an Avaya G650 Media Gateway
December 2003

Connecting the media gateway to the main distribution frame

on page 149
on page 151
Figure 52, Equipment room cabling labels,
1 A 2
A
3
Yellow Label (Auxiliary)
4
Blue/Yellow Label (Site or
Satellite)
Installing Cable Slack
on page 153
on page 149 is installed on
labels LJK 060396
on page 153
on
149