Normal Ac Input And Output Cables Installation - MGE UPS Systems EX 5 Installation And User Manual

Rt systems
Table of Contents

Advertisement

EX 5/7/11 RT Systems
Proceed as follows:
1. For normal AC input, make connections to L1, L2, and
Bypass AC input. Make connections to
CAUTION:
2. Attach I/O Box to the Power Module with three screws.
Figure 2-12: Normal AC Input and Output Cables Installation.
Power Module I/O Box
Output
200/208/220/230/240Vac
Normal AC source
200/208/220/230/240Vac
L6
L5
To Load
208VAC
Simplified Connection Diagram
UPSTREAM
CIRCUIT
BREAKER
(NOT SUPPLIED)
AC INPUT
2 — 14
, L5, L6 terminals for output.
Always connect the earth ground wire first.
Jumper must be between L1 and L3. System is factory configured for 208VAC
output.
Bypass AC source
200/208/220/230/240Vac
L2
L1
L1
L4
L3
Jumper
From Utility
208 VAC
Output to Load
Transformer Module
(if applicable)
Bypass AC
Normal AC
terminals only. No connections are required for
OFF
O
2
OFF
O
or
To Load or
Transformer Module
(if applicable)
Installation
1
Normal AC Input
Output
86-86000-00 B01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ex 7Ex 11Ex 11

Table of Contents