Installation In Tower Configuration; Optional Transformer Module - MGE UPS Systems EX 5 Installation And User Manual

Rt systems
Table of Contents

Advertisement

EX 5/7/11 RT Systems
2.3

Installation in Tower Configuration

Follow the numerical sequence to assemble tower stands and tower stand expanders, shown in Figure 2-3.
Figure 2-3: Tower Configuration of Standard System and Optional Transformer Module.
Tower Configuration with Standard System
5
4
1
Tower Configuration with Optional Transformer Module
5
3
4
1
2 — 4
B R
T
E X
R T
E X
1 1
Battery Module
ON
OFF
Power Module
3
4
3
4
4
2
2
1
B R
T
E X
Battery Module
1 1
R T
E X
ON
OFF
Power Module
Transformer Module
4
3
4
4
2
2
1
Use the same procedure
for tower mounting multiple
battery modules, if applicable.
Installation
86-86000-00 B01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ex 7Ex 11Ex 11

Table of Contents