Installing Power Supply Modules; Overview; Installing A Power Supply; Figure 19: Removing The Rear Panel - Allied Telesis AT-IX5-28GPX Installation Manual

Gigabit ethernet switch
Hide thumbs Also See for AT-IX5-28GPX:
Table of Contents

Advertisement

Installing Power Supply Modules

Overview

Installing a
Power Supply
The AT-IX5-28GPX switch has two rear slots for hot-swappable power
supplies. You can install one or two AT-PWR800 power supplies.
The switch is supplied with a factory installed blank panel that covers both
power supply slots, and with a separate blank panel to use if you only
install one power supply.
The installation procedure is identical for each power supply.
To install a power supply, perform the following procedure:
1. Remove the module from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Remove the blank panel from the power supply slots on the rear panel
of the switch by unscrewing it, as shown in the following figure.
Figure 19. Removing the rear panel
IX5-28GPX Installation Guide
63

Advertisement

Table of Contents
loading

Table of Contents