Installing The Switch In An Equipment Rack; Figure 23: Turning The Switch Upside Down; Figure 24: Removing The Rubber Feet - Allied Telesis AT-IX5-28GPX Installation Manual

Gigabit ethernet switch
Hide thumbs Also See for AT-IX5-28GPX:
Table of Contents

Advertisement

Installing the Switch in an Equipment Rack

This procedure requires the following items:
Twelve bracket screws (included with the switch)
Two equipment rack brackets (included with the switch)
Flat-head screwdriver (not provided)
Cross-head screwdriver (not provided)
Four standard equipment rack screws (not provided)
Installation guidelines may be found in "Choosing a Site for the Switches"
on page 56. Here is the procedure for installing the switch horizontally or
vertically in a 19-inch equipment rack.
Caution
The chassis may be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack.
1. Place the unit upside down on a level, secure surface.
S2/28
26
CONSOLE
S1/27
25
SFP+
Figure 23. Turning the Switch Upside Down
2. Using a flat-head screwdriver, pry the rubber feet from the bottom of
the switch, as shown in Figure 24.
Figure 24. Removing the Rubber Feet
E28
COL
HDX
FDX
ACT
LINK
10/100
ACT
LINK
1000
2669
IX5-28GPX Installation Guide
2668
67

Advertisement

Table of Contents
loading

Table of Contents