Purpose
This Installation Guide shows how to correctly install the optional 4300 Series Kick Plates on the 4300 UPS, 431A
Ancillary Cabinet, and the 431B Battery Cabinet. These instructions are also available in the Manuals for the respec-
tive cabinets.
Toshiba International Corporation reserves the right, without prior notice, to update information, make product changes,
or discontinue any product or service identified in this publication.
Toshiba International Corporation shall not be liable for direct, indirect, special, or consequential damages resulting
from the use of the information contained within this Installation Guide.
Box Contents
Part Number
Instruction Sheet (P/N 66597)
F/B (Front/Back) Kick Plate, 22 in.
Side Kick Plate, 30.5 in.
NOTES
Tools Required
None - The kick plates consist of the F/B panels that magnetically latch to the welded base of the 4300 Series cabi-
nets and a second pair (sides) that magnetically latch to the F/B plates.
Installing 4310-30/50-KP-A
NOTE: Due to variations within manufacturing specifications, the spacing on the base channels may be
slightly more or less than the separation between the magnetic
latches of the kick plates.
To correct this the installer should bend the magnetic latch support
tab slightly to ensure a snug fit to the base channels.
STEP 1: Fit the F/B Plates with the UPS C-channel
skids.
1.1
Place a F/B kick plate on edge on the floor, magnetic latches side
toward the UPS with the magnetic latch faces facing left. See Figure 1.
1.2
Place one in front and one at the back of the UPS.
1.3
Slide the front F/B kick plate forward until both magnet latches adhere
to the left and right vertical C-channel base skid member.
1.4
If one of the magnets does not latch firmly, or the spacing is too nar-
row, bend one or the other of the magnetic latch supports in or out as
required to ensure a good fit. See Figure B1.
1.5
Repeat Step 1.3 and 1.4 for the F/B kick plate at the back of the UPS.
1.6
Remove the F/B kick plates from the C-channel base skids.
4300 Series Installation and Operation Manual
4310-30/50-KP-A
1
2
2
Initial set of kick plates to
enclose the base of one
4300 cabinet.
Both pair of kick plates are symmetrical - there is no upside
down.
4310-30/50-KP-B
1
2
(None)
Add-on kick plates to enclose ad-
ditional cabinets. The sides are
moved to the outer sides outermost
cabinets in the lineup.
Left Base Skid
Right Base Skid
Figure B1
73

Advertisement

Table of Contents
loading

This manual is also suitable for:

4310f3f3004310f3f500

Table of Contents