Installing 4310-30/50-KP-B
The 4310-30/50-KP-B Kick Plate Kit contains one pair of F/B kick plates. This kit is required for each standard ad-
ditional 4300 Series add on frame, such as the 431A and 431B. The 431M is already provided with a base skirt.
NOTE: Due to variations within manufacturing specifications, the spacing on the base channels may be
slightly greater of less than the separation between the magnetic latches of the kick plates.
To correct this the installer should bend the magnetic latch support tab slightly to ensure a snug fit to the
base channels.
STEP 1: Move Side Plates to outer-most
C-channel base
Move the Side kick plates to the the outer sides of the assem-
bled 4300 Series units. See Figure 7, 8.
STEP 2: Install the F/B Plates
Install the F/B kick plates as described on Pages 73-75.
Figure 7
Batt. Cabinet
4300 UPS
MBS Cabinet
Aux. Cabinet
Side Kick
Plate
Side Kick
Plate
F/B Kick Plates
(Back Side Similar)