Install The Power Distribution Board - Fujitsu SPARC Enterprise T5220 Service Manual

Fujitsu server user manual
Hide thumbs Also See for SPARC Enterprise T5220:
Table of Contents

Advertisement

Removing the Power Distribution Board From a SPARC Enterprise T5120 Server
FIGURE:
8. Grasp the bus bar and pull the power distribution board/bus bar assembly to
the left, away from the paddle card.
9. Lift the power distribution board/bus bar assembly up and out of the system.
10. Place the power distribution board/bus bar assembly on an antistatic mat.
Related Information
"Install the Power Distribution Board" on page 163

▼ Install the Power Distribution Board

1. Lower the power distribution board/bus bar assembly into the chassis.
The power distribution board fits over a set of mushroom standoffs in the floor of
the chassis.
2. Slide the power distribution board/bus bar assembly to the right, until it plugs
into the paddle card.
Servicing Boards and Components
163

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise t5120

Table of Contents