Figure 40. Installing An Sfp Transceiver; Figure 41. Positioning Handles On The X600-24Ts And X600-24Ts/Xp Switches - Allied Telesis x600-48Ts Installation Manual

X600 series layer 3 gigabit ethernet switches
Hide thumbs Also See for x600-48Ts:
Table of Contents

Advertisement

2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. Position the transceiver with the label facing up.
4. Slide the transceiver into the slot until it clicks into place. See Figure
40.
2 3 R
2 4 R

Figure 40. Installing an SFP Transceiver

5. For the x600-24Ts and x600-24Ts/XP switches, verify that the handle
on the SFP transceiver is in the upright position, as shown in
Figure 41, to prevent inadvertently removing the transceiver.
2 3 R
2 4 R
Figure 41. Positioning Handles on the x600-24Ts and x600-24Ts/XP
x600 Layer 3 Gigabit Ethernet Switch Installation Guide
C L A S
S 1
L A S E
R P R O
D U C T
L/ A
S F P
D /C
2 1
2 2
2 3
2 4
1331
C L A S
L A S E
S 1
R P R O
D U C T
L/ A
S F P
D /C
2 1
2 2
2 3
2 4
1331
Switches
P O R T
1 0 0 0
A C
L IN K
/
F D X
A C T
P O R T
1 0 0 0
A C
L IN K
/
F D X
A C T
81

Advertisement

Table of Contents
loading

This manual is also suitable for:

X600-24ts/xpX600-24tsX600-48ts/xpX600-24ts-poe

Table of Contents