Installing The Switches In An Equipment Rack; Figure 30. Removing The Feet; Figure 31. Attaching Rack-Mount Brackets - Allied Telesis x600-48Ts Installation Manual

X600 series layer 3 gigabit ethernet switches
Hide thumbs Also See for x600-48Ts:
Table of Contents

Advertisement

Installing the Switches in an Equipment Rack

Perform the following procedure to install each switch in a standard
19-inch rack:
Note
Steps 1, 2, and 3 are optional. These steps provide instructions on
how to remove the snap-on plastic feet from the bottom of a switch.
You can leave the feet on.
1. Place the switch upside down on a level, secure surface.
2. Using a flat-head screwdriver, remove the snap-on plastic feet from the
bottom of the switch, as shown in Figure 30.
3. Turn the switch over.
4. Attach a rack-mount bracket to one side of the switch using four of the
screws that come with the switch, as shown in Figure 31.
1
3
5
7
9
11
13
15
2
17
4
19
6
21R
8
10
12
14
16
18
20
22R

Figure 31. Attaching Rack-Mount Brackets

x600 Layer 3 Gigabit Ethernet Switch Installation Guide

Figure 30. Removing the Feet

23R
LAS ER
CLA SS
PRO DUC
1
T
L/A
SFP
100 0
PO RT
D/C
LIN K
AC TIV
24R
FDX
/
ITY
ACT
10/1 00
LIN K
21
HDX
/
/
ACT
XFP
CO L
22
23
L/A
XFP
STA CK
x6 00
24
MST R
1
SD
-2 4T
3
s/ XP
L/A
5
25
1
7
L/A
9
D/C
11
REA DY
2
13
L/A
15
BUS Y
L/A
17
26
PRE S
19
FAU LT
21R
D/C
23R
2
4
6
8
10
12
14
16
18
20
22R
24R
Lay er
3 Gig
ab it Eth
en et
SFP
Sw itch
L/A
CON SOL
E
21
STA TUS
22
23
FAU LT
24
MA STE
R
RPS
PW R
RES ET
1327
69

Advertisement

Table of Contents
loading

This manual is also suitable for:

X600-24ts/xpX600-24tsX600-48ts/xpX600-24ts-poe

Table of Contents