Unpacking A Switch - Allied Telesis x600-48Ts Installation Manual

X600 series layer 3 gigabit ethernet switches
Hide thumbs Also See for x600-48Ts:
Table of Contents

Advertisement

Unpacking a Switch

To unpack a switch, perform the following procedure:
1. Remove all components from the shipping packages.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Make sure the following components are included in your switch
package. If any item is missing or damaged, contact your Allied Telesis
sales representative for assistance.
One x600 Series Layer 3 Gigabit Ethernet Switch
Two rack-mount brackets
Eight flathead Phillips rack-mount bracket screws
AC power cord (Americas, Australia, EU, Japan, and UK only)
AC power cord retaining clip
Management cable for local management
x600 Layer 3 Gigabit Ethernet Switch Installation Guide
67

Advertisement

Table of Contents
loading

This manual is also suitable for:

X600-24ts/xpX600-24tsX600-48ts/xpX600-24ts-poe

Table of Contents