Installation - JUKI LBH-1790 Instruction Manual

Hide thumbs Also See for LBH-1790:
Table of Contents

Advertisement

#. INSTALLATION

WARNING :
To prevent possible accidents caused by the fall of the sewing machine, perform the work by two
persons or more when the machine is moved.
(1) Set-up of the table
7
1
8
) Securely nstall control box 2 and power swtch 3 on table 1 .
2) Securely fix the respective power cables of power switch 3 .
3) Pass four bed base fixed screws !1 through bed base 4 .
4) Set rubber cushons 5 to holes 6 (4 places) for fixing bed base and fix bed base 4 .
5) Fx head support bar 7 on table 1 .
6) After placng the sewng machne man unt on bed base 4 , connect pedal (rght sde) to pedal swtch
9 , and pedal (left sde) to pedal sensor !0 respectvely wth connectng rods 8 whch have been
suppled as accessores.
Adjust the positions of the pedals so that connecting rods 8 and control box 2 do not
come in contact with each other.
4
6
9
– 4 –
!1
5
3
!0
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents