Power On Sequence; Ce/Tuv/Ul/Csa - Euphonix System 5 Control Surface/Frame Manual

Control surface/frame
Table of Contents

Advertisement

7)
8)
9)
10) Grounding or Polarization – Do not defeat the grounding or polarization of

Power On Sequence

The Control Surface modules are powered up by a switch on the back of the frame.
The Control Surface should be powered up after the Virtual Mixer is running.

CE/TUV/UL/CSA

CE documentation is available.
S5 Control Surface/Frame Manual
a) Objects have fallen, or liquid has spilled into the Control Modules;
or
b) A Control Module does not appear to operate or exhibits a marked
change in performance; or,
c) A Control Module has been dropped or sustained other physical
damage.
Servicing – Do not attempt to service the Control Modules beyond those
means described in this operation manual. All other servicing should be
referred to the Euphonix Tech Support department.
Fuse replacement – To prevent electric shock and avoid risk of fire, replace
fuse only with the same type and rating.
To prevent electric shock, do not use the Control Modules polarized plug with
an extension cord, receptacle or other outlet unless the blades can be fully
inserted to prevent blade exposure.
the Control Modules.
Page 5
Version 1.0 ©1999 Euphonix, Inc.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S5System 5

Table of Contents