230 MG 1000B platform hardware installation
Preparing for rack-mounting
Procedure 14
Preparing the Signaling Server for rack-mounting
Step
The Front Mount Bracket assembly is not intended for use as a slide rail
system. The Signaling Server must be firmly attached to the rack.
1
2
Figure 76
Signaling Server support bracket
3
4
Copyright © 2007, Nortel Networks
.
Action
Make sure the Signaling Server is not plugged into an electrical
outlet.
Align the end of the rail (A in
(two of each)" (page
Server support bracket" (page
Server. See
Figure 76 "Signaling Server support bracket" (page
230).
Align the screw holes in the rack-mount rail with the mating holes in
the side of the Signaling Server. Use three screws (C) on each side.
Hand-tighten the screws to prevent cross-threading then use a
Phillips screwdriver to secure them.
Attach the bezel door to the faceplate of the Signaling Server, as
shown in
Figure 77 "Left hinge mount" (page 231)
"Right hinge mount" (page
Nortel Communication Server 1000
Branch Office Installation and Commissioning
NN43001-314 01.02 Standard
Release 5.0 20 June 2007
Figure 75 "Signaling Server brackets
229)) with the flange (B in
230)) toward the back of the Signaling
231).
Figure 76 "Signaling
and
Figure 78