Verifying A Successful Configuration; Connecting The Mg 1000B Core To The Network; Verifying Successful Configuration - Nortel 1000 Branch of?ce Installation And Commissioning Manual

Branch office
Hide thumbs Also See for 1000 Branch of?ce:
Table of Contents

Advertisement

244 MG 1000B software installation
After installing software and configuring basic information about the
Signaling Server, the Signaling Server components can be configured using
the web-based Element Manager interface. See Element Manager System
Reference - Administration (NN43001-632).
Verifying a successful configuration
To ensure that ELAN and TLAN network interfaces on the Signaling Server
are configured correctly, perform a ping test at each interface.
Procedure 20
Verifying successful configuration
Step
1
2
3

Connecting the MG 1000B Core to the network

Connecting the MG 1000B Core to the network
The MG 1000B Core has two 10/100BaseT ports (1 and 2) and one
Attachment Unit Interface (AUI) port at the back on the lower left-hand side.
See
Copyright © 2007, Nortel Networks
.
Action
From the Call Server, in LD 117, enter:
ping <ip address>
From the Media Card, log in to the Media Card and enter:
ping "ip address",3
From the Signaling Server, log in and enter:
ping "ip address",3
Figure 88 "Back of MG 1000B Core" (page
Nortel Communication Server 1000
Branch Office Installation and Commissioning
NN43001-314 01.02 Standard
Release 5.0 20 June 2007
—End—
—End—
245).

Advertisement

Table of Contents
loading

Table of Contents