Welch Allyn PROPAQ CS Service Manual page 88

Vital signs monitor
Hide thumbs Also See for PROPAQ CS:
Table of Contents

Advertisement

84
Repair procedures
6. Lift out the Recharger Board.
When installing the Recharger Board:
blow out any dust and particulates using pressurized de-ionized gas
move all cables out of the way
torque screws to 3.8 in-lb to 4.2 in-lb (0.43 N-m to 0.47 N-m)
Caution As you set the Recharger Board in place during installation, keep the
Board away from the power switch solder terminals to avoid binding against
them. The terminals may become damaged if force is applied against them.
Welch Allyn Propaq CS Vital Signs Monitor
Screws
Screws
0696 40

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents