Replacing The Sidestream Co2 Assemblies - Welch Allyn PROPAQ CS Service Manual

Vital signs monitor
Hide thumbs Also See for PROPAQ CS:
Table of Contents

Advertisement

100
Repair procedures
set the two boards and side panels in place, making sure that the boards are seated
on the support tabs
torque screws to 4.75 to 5.25 in-lb (0.54 to 0.59 N-m)
reconnect the Mainstream CO
Replacing the Sidestream CO
The following instructions describe how to replace the Sidestream CO
in the Expansion Module. These include the Sidestream Processor (SSP) Board, the
Sidestream CO
1.
Loosen the Expansion Module front chassis
2. Disconnect J1 and J3 from the SSP Board to completely separate the Front Chassis.
Replacing the Extender Board
1.
Remove the Extender Board from the MSP Board through the left card slot in the
Expansion Module.
When reinstalling the Extender Board, observe P6 connector mating while installing
through the left card slot to ensure proper connection with the MSP Board.
patient connector cable
2
assemblies
2
"Stick" Board, and the Extender Board.
2
Welch Allyn Propaq CS Vital Signs Monitor
option assemblies
2
("Expansion Module"
on page 90).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents