Welch Allyn PROPAQ CS Service Manual page 74

Vital signs monitor
Hide thumbs Also See for PROPAQ CS:
Table of Contents

Advertisement

70
Repair procedures
P1 removal
6. Spread the casing open to an angle of about 45-60 degrees.
7 .
Detach the following cables from the Front Chassis (shown below):
P6
P5
P7
Cable to P5 on the Analog Board, from left side panel ECG connector on the Rear
Chassis.
Cable to P6 on the Analog Board, from left side panel IPB connector on the Rear
Chassis.
Cable to P7 on the Analog Board, from left side panel temperature jack on the
Rear Chassis.
Cable to P8 on the lower (Digital) Board, from the right side panel on the Rear
Chassis.
Cable to P9 on the Digital Board, from the right side panel on the Rear Chassis.
P5
P7
P10
P11
P6
Welch Allyn Propaq CS Vital Signs Monitor
P9
P8
NOTE: You do not need to remove
the handle for this procedure. The
handle is not shown here so the
cable connections are more visible

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents