Powering on and off

Read the following sections to power on and off SAN Switches.

SAN Switch 2/8V

Connect one end of the power cord to the AC inlet on the switch, and the remaining end to a
power source.
To power on, set the AC power switch to I. The switch runs POST by default each time it is
powered on, reset, or rebooted. POST requires approximately 3 minutes.
To power off, set the AC power switch to O and remove the power cord from the power source.
NOTE:
Removing all power from the switch triggers a system reset. All devices are returned to
their initial state the next time the switch is powered on.

SAN Switch 2/16V, 2/16N and 4/32

Connect one or both power cords to the AC power inlets on the nonport side of the switch, and
the remaining end to a power source.
To power on, set both AC power switches to I. Power is supplied to the switch as soon as the
first power supply is connected and powered on.
To power off, set the AC power switch to O and remove the AC power cord from the power
source.
NOTE:
Removing all power from the switch triggers a system reset. All devices are returned to
their initial state the next time the switch is powered on.