Integrated Bmc Initialization - Intel MFSYS25V2 Specification

Technical product specification
Hide thumbs Also See for MFSYS25V2:
Table of Contents

Advertisement

Intel® Compute Module MFS5520VI TPS
4. Move jumper from the default operating position (pins 1-2) to the "Enabled" position
(pins 2-3)
5. Close the compute module.
6. Reinstall and power up the compute module.
7. Perform Integrated BMC firmware update procedure.
8. Power down the compute module.
9. Remove the compute module from the server system.
10. Move jumper from the "Enabled" position (pins 2-3) to the "Disabled" position (pins 1-2).
11. Close the compute module.
12. Reinstall the compute module into the modular server chassis.
13. Power up the compute module.
Note: Normal Integrated BMC functionality (for example, KVM, monitoring, and remote media)
is disabled with the force BMC update jumper set to the "Enabled" position. The server should
never be run with the BMC force update jumper set in this position and should only be used
when the standard firmware update process fails. This jumper should remain in the default –
disabled position when the server is running normally.
5.1.3

Integrated BMC Initialization

When the DC power is first applied to the compute module by installing it into a chassis, 5V-
STBY is present, the Integrated BMC on the compute module requires 15-30 seconds to
initialize. During this time, the power button functionality of the control panel is disabled,
preventing the compute module from powering up.
Revision 1.5
Intel order number: E64311-007
Jumper Block Settings
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mfsys35Compute module mfs5520vi

Table of Contents