Completing the option installation

To complete installation of an option, you must reinstall the bezel, reinstall the
server cover, reconnect all the cables that you disconnected earlier and, for certain
options, run the Configuration/Setup Utility program. Follow the instructions in this
section.
Attention:
shortly after turning on the server. Operating the server for extended periods of time
(over 30 minutes) with the server cover removed might damage server components.
Note: If you have just plugged the power cords of your server into electrical outlets,
you will have to wait approximately 20 seconds before pressing the power-control
button.

Replacing the bezel

The following illustration shows how to install the bezel on the server.
Complete the following steps to replace the bezel:
1. Insert the two tabs on the bottom of the bezel into the matching holes on the
2. Push the top of the bezel toward the server until the two tabs at the top of the
3. For hot-swap hard disk drive models, make sure the side cover is unlocked;
66
IBM xSeries 225 Types 8649: Hardware Maintenance Manual and Troubleshooting Guide
For proper cooling and airflow, replace the server cover before or
server chassis.
bezel snap into place.
then, insert the hot-swap lock bar into the slots on the bezel and rotate it to the
locked position. The hot-swap lock bar locks when you lock the side cover key
lock.