Download Print this page

Danfoss iC7 Installation Manual page 3

Automation air-cooled enclosed drives 206/385–1710 a
Hide thumbs Also See for iC7:

Advertisement

Installation Guide | iC7-Automation Air-cooled Enclosed Drives
Contents
Overview
1
1.1
Safety and Installation Awareness
Checking the Delivery and the Contents
1.2
1.3
Lifting the Enclosed Drive
2
Mechanical Installation
2.1
Installation Requirements
2.2
Installing the Enclosed Drive
Installing the Enclosed Drives Back to Back
2.3
2.4
Installing the IP21 Top Cover
2.5
Installing the Back-channel Cooling Option
Electrical Installation
3
3.1
Grounding Principles
Prerequisites for Cable Installation
3.2
3.3
Installing Power Cables
3.3.1
Installing the Power Cables through the Bottom
3.3.2
Installing the Power Cables through the Top (+KCIT or +KDOT)
3.4
Installing the Brake Cables, FE9, FE10
3.5
Power Cabling Floor Components, UL
Checking the Settings for the Auxiliary AC Voltage Transformer (+IHAT)
3.6
3.7
Parameter Settings for IT Mains
4
Control and Option Installation
4.1
Control Compartment Connections
4.2
I/O and Relay Option Connections
Control Cable Routing
4.3
4.4
Installing Boards to the Control Compartment
4.5
Wiring of the I/O and Relay Options
4.6
Installing the Control Cables
4.7
Installing the microSD Card
Danfoss Drives Oy © 2024.09
AN484843731544en-000101 / 172K4825A |
Contents
5
5
5
7
7
7
8
9
11
11
13
13
14
16
16
17
17
18
19
22
26
27
27
30
3

Advertisement

loading
Need help?

Need help?

Do you have a question about the iC7 and is the answer not in the manual?

Questions and answers