7 Commissioning
Procedure:
1. Activate the Wi-Fi access point on the product. Tap on the enclosure lid of the product twice.
☑ The COM LED is intermittently flashing orange and green for approx. 5 seconds. The Wi-
Fi access point is then activated for approx. 30 minutes. Once this period has expired,
the Wi-Fi access point is deactivated automatically.
2. Scan the QR code on the device label using your terminal.
3. Confirm the connection to the Wi-Fi access point of the product on your terminal. It may be
necessary to deactivate the mobile data connection on your smart terminal.
4. Open the web browser of your smart terminal and enter the IP address https://
192.168.12.3 into the address bar or, if your smart terminal supports MSDNs services,
SMA[serialnumber].local or https://SMA[serialnumber]. Or, to open the user interface
directly, scan the right QR code on the label included in the delivery using your smart terminal.
☑ When you connect to the user interface for the first time, the welcome page opens. The
Commissioning Assistant for configuring the product can be started via the welcome
page.
☑ The login page of the user interface opens if the product has already been configured.
7.5
Registration in Sunny Portal
7.5.1
Profiles for data communication
Different profiles are available to control the intensity of data communication in the system.
The profiles can be edited in the system properties at any time in Sunny Portal to adjust the intensity.
Note that when switching from a low to a high intensity data communication, the data from the past
is not retroactively adjusted. The adjustment applies from the date of the change.
The following profile can be selected for data communication:
Profile
High (default set-
ting)
Medium
Low
7.5.2
Register as a new user in Sunny Portal
Requirements:
☐ An active Internet connection must be established.
Procedure:
1. Call up the Internet address https://ennexOS.SunnyPortal.com in the web browser.
2. Select Register.
3. Enter the necessary data for registration.
54
EDMM-20-BE-en-10
Explanation
Devices send all relevant data to the Sunny Portal every 5 minutes.
Devices send all relevant data to the Sunny Portal every 15 minutes.
Devices send the most important data to the Sunny Portal 6 times per day.
SMA Solar Technology AG
Operating manual
Need help?
Do you have a question about the DATA MANAGER M and is the answer not in the manual?