Before the installation

B
Electrical wiring considerations
Take into consideration this section before start wiring
connections of the Charge Point.
1 - I N P U T P O W E R S U P P LY
The input power supply line for the Charge Point must be hardwired from a
dedicated power transformer or generator and not by LV overhead power lines.
It has to be done under electrical safety regulations according to your country.
2 - P O W E R S U P P LY L I N E D I M E N S I O N I N G
The dimensioning of the input power supply line of the Charge Point must be
checked by a qualified electrician. Note that various factors, such as, cable
length between distribution board and the Charge Point; maximum input current
of the Charge Point; the installation way, may have influence of the selected
cable. In such cases, increasing the cable cross-section can be necessary.
The installation company will be responsible for dimensioning the wires cross
section and the electrical protections,
3 - M A X I M U M O U T P U T P O W E R
Depending on the input power line, you can carry out the charging sessions to the
electric vehicle with different output power, it is possible to limit the maximum
output power by software so as not to exceed the available input power.
In order to implement this limitation by software, refer to the User Manual.
Note: In Chapter 5, you are going to find more electrical instructions so as to
implement a secure POWER SUPPLY LINE.
taking into account the conditions above.