Verification
Once completed the entire installation procedure, check the following points:
Complete the Commissioning checklist.
Check that all the MCB, RCD, Main Circuit Breaker and Disconnectors installed
upstream the Charge Point are powered on.
Check that all safety labels are correctly placed.
Close the Charge Point's doors. The Charge Point has a security switch (anti-
tamper protection) installed that will avoid any charging session if the doors are
opened.
Check that all beacons are illuminated in green.
Verify that each EV connector is in good condition.
Make sure the ventilation air flow is correct and there is not any obstruction at the
air inlets and outlets.
Check for abnormal noise while charging a vehicle.
B
How to use and configure
In order to use and configure the Charging Station there is an User Manual. To get it,
download it from the Expert Area or send a mail to support@circontrol.com.
Note: Ask Circontrol Support Department in order to register in the Circontrol Expert
Area.
55

Advertisement

loading
Need help?

Need help?

Do you have a question about the Raption 200 and is the answer not in the manual?

Questions and answers