3 — P L AC I N G T H E P O W E R U N I T I N T H E F I N A L L O C AT I O N
Once the Power Unit is free from the pallet, the only way to move the charger is with
forklift.
1- Assure the decorative front and rear panel are removed.
2- Assure it will be available enough space to introduce the forklift.
3- See where label "Center of gravity" is located in the packaging in order to move
it safely.
19
Once Charge Point installation has been finished, re-
member to install all the decorative panel removed
previously.