Download Print this page

Circontrol Raption 200 Installation Manual page 6

Advertisement

Raption 200 Installation Manual
1
This manual provides information for installing a 200kW power Charge Point,
which has been designed and tested to allow charging electric vehicles, as
specified at IEC 61851 standards.
This document has different sections describing electrical components inside the
Charge Point and a step-by-step installation procedure.
It is mandatory to follow the basic security information supplied in this manual to
ensure safe and proper installation.
Failure to follow safety instructions may involve personal injury, equipment
damage and danger of death. CIRCONTROL is not responsible for events arising
from such breach.
01
THE FOLLOWING SYMBOLS ARE USED FOR IMPORTANT
SAFETY INFORMATION IN THIS DOCUMENT
ELECTRIC RISK
- This symbol indicates a potentially hazardous situation which, if not
avoided may result in a risk of fire, serious injury or death.
- The Charge Point must be disconnected from any power
source before performing any maintenance, repair or electrical
manipulation inside.
ATTENTION!
- Follow the instructions preceded by this symbol, if not respect
them or perform them correctly, may result in minor or moderate
injury to the user, damage to equipment, damage to facilities or
other property.
- Handling the equipment can cause injuries as result of the
dimension and weight. Personnel handling the unit must wear safety
shoes and gloves.

Advertisement

loading
Need help?

Need help?

Do you have a question about the Raption 200 and is the answer not in the manual?

Questions and answers