Installation; Requirements For Installation And Wiring - Omron NE1A-SCPU01 - 07-2009 Operation Manual

Safety network controller
Hide thumbs Also See for NE1A-SCPU01 - 07-2009:
Table of Contents

Advertisement

Installation

3-1
Installation
3-1-1

Requirements for Installation and Wiring

Installation and Storage Environment
38
Consider the following for installation and wiring to improve the reliability of
the NE1A-series Safety Network Controller System and to fully exploit the
system's capabilities.
Do not use or store the NE1A-series Controller in any of the following loca-
tions.
• Locations subject to direct sunlight
• Locations subject to temperatures or humidity outside the ranges speci-
fied in the specifications
• Locations subject to condensation as the result of severe changes in tem-
perature
• Locations subject to corrosive or flammable gases
• Locations subject to dust (especially iron dust) or salts
• Locations subject to water, oil, or chemicals
• Locations subject to shock or vibration
Take appropriate and sufficient measures when installing systems in the fol-
lowing locations. Inappropriate and insufficient measures may result in mal-
function.
• Locations subject to static electricity or other forms of noise
• Locations subject to strong electromagnetic fields
• Locations subject to possible exposure to radioactivity
• Locations close to power supplies
Section 3-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents