UPS5000-H-600 kVA-FT(M)
User Manual (FusionPower6000)
Drilling Holes
Issue 02 (2024-01-05)
Ensure that the angle between two hoisting ropes is no more than 90
degrees, as shown in the following figure.
Obtain consent from the customer and contractor before drilling holes.
Wear protective equipment such as safety goggles and protective gloves when
drilling holes.
To avoid short circuits or other risks, do not drill holes into buried pipes or
cables.
When drilling holes, protect the equipment from shavings. After drilling, clean
up any shavings.