2.2 Powering Off a Single ESS

2.2.1 Sending a Shutdown Command on the SmartLogger

Step 1 Log in to the SmartLogger WebUI, choose Overview >
a batch shutdown command to the ESSs connected to the same DC bus.
Figure 2-1 Batch shutdown of the ESSs connected to the same DC bus
Step 2 Click Monitoring and check that the indicators for the PCS, ESC, and ESR are
yellow or gray.
----End

2.2.2 Power-Off Process

Table 2-1 Power-off procedure
Step
1
Issue 02 (2023-02-28)
Reflective vest
-
Item
Powering
Powering off the battery side
off the AC
of the AC power distribution
side of the
cabinet
Smart PCS
Copyright © Huawei Digital Power Technologies Co., Ltd.
2 Routine Maintenance
Safety helmet
-
, and click
Remarks
As shown by (1) in
2-2.
Safety harness
-
to send
Figure
22