LUNA2000-200KWH-2H1 Smart String ESS
Maintenance Manual
Figure 11-3 Installing a DC switch
Step 4 Reinstall the cover.
----End
Follow-up Procedure
Step 1 Power on the system. For details, see the power-on section in the ESS user
manual.
Step 2 Check the running status of the system and ensure that the functions are restored.
----End
Issue 02 (2023-02-28)
Copyright © Huawei Digital Power Technologies Co., Ltd.
11 Replacing a Circuit Breaker
110