Quarterly Maintenance - Huawei LUNA2000-200KWH-2H1 Maintenance Manual

Smart string ess
Hide thumbs Also See for LUNA2000-200KWH-2H1:
Table of Contents

Advertisement

LUNA2000-200KWH-2H1 Smart String ESS
Maintenance Manual

2.3.2 Quarterly Maintenance

Table 2-2 Quarterly maintenance checklist
Maintenan
Maintenance Action
ce
Category
Cabinet
Perform the visual inspection:
● Appearance
● Rust condition
● Door lock
● Vent
Air
● Check the appearance.
conditioner
● Clean the filter
[1]
Adapter
Check the indicator status.
Power
Check whether there are foreign
distribution
objects in the power distribution
area
area.
Pressure
Perform the visual inspection:
relief
● Appearance
[3]
window
● Rust condition
● Foreign objects/Ice and snow
Issue 02 (2023-02-28)
[2]
.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Expected Result
● The coating is not
peeling or scratched.
● There is no obvious
paint peeling or rust.
● The door locks are not
damaged.
● There is no dust at the
vents.
● There are no insects,
rodents, snakes or other
animals.
● There is no obvious
damage to the
appearance.
● There is no obvious
paint peeling or rust.
● The screws are secured.
● The fans rotate properly
without abnormal
sound.
● The filter is clean and
free from blockage.
The indicator is steady
green.
The area is clean and free
from foreign objects.
● There is no obvious
paint peeling or rust.
● Pressure relief windows
are not damaged.
● There is no foreign
object, ice, or snow on
the top.
2 Routine Maintenance
System
Powered Off
or Not
No
No
No
No
No
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna2000-200kwh-100kw-2h1

Table of Contents