Huawei LUNA2000-200KWH-2H1 Maintenance Manual page 97

Smart string ess
Hide thumbs Also See for LUNA2000-200KWH-2H1:
Table of Contents

Advertisement

LUNA2000-200KWH-2H1 Smart String ESS
Maintenance Manual
Follow-up Procedure
Step 1 Turn on DC/DC switch 2FCB1 in the cabinet.
Step 2 Log in to the SmartLogger WebUI, CMU WebUI, FusionSolar app, or management
system and send a startup command to the rack controller.
Step 3 Check that the alarm is cleared.
Step 4 Turn on DC switch 1Q1 in the cabinet.
Step 5 Turn on DC switch 1Q2 in the cabinet.
Step 6 Check the running status of the rack controller and check whether it functions
properly.
----End