Huawei LUNA2000-200KWH-2H1 Maintenance Manual page 109

Smart string ess
Hide thumbs Also See for LUNA2000-200KWH-2H1:
Table of Contents

Advertisement

LUNA2000-200KWH-2H1 Smart String ESS
Maintenance Manual
Figure 8-19 Installing a new air conditioner
Step 6 Connect the air conditioner cables.
Step 7 Install the air duct. Use an M5 Phillips insulated torque screwdriver with a torque
of 3 N·m.
----End
Follow-up Procedure
Step 1 Turn on the power switch of the air conditioner in the cabinet.
Step 2 Log in to the CMU, choose Maintenance > Connect Device > Remove Devices,
and remove the old air conditioner.
Figure 8-20 Removing the old air conditioner
Step 3 Click Auto. Search and add the new air conditioner.
Issue 02 (2023-02-28)
Copyright © Huawei Digital Power Technologies Co., Ltd.
8 Replacing an Air Conditioner
103

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna2000-200kwh-100kw-2h1

Table of Contents