LUNA2000-200KWH-2H1 Smart String ESS
Maintenance Manual
Figure 20-4 Positions of the jumpers on the TCUE control board
Step 7 Adjust the positions of the jumper caps on the new TCUE control board based on
the recorded information.
Step 8 Connect cables to the new TCUE control board based on the recorded information.
Step 9 Install the new TCUE control board to the TCUE control box.
Figure 20-5 Installing the new TCUE control board
Step 10 Reinstall the TCUE control box.
Issue 02 (2023-02-28)
Copyright © Huawei Digital Power Technologies Co., Ltd.
20 Replacing an Exhaust Controller
137