Paint Supply Information
Table 27-2 Paint requirements
Item
Primer thickness
Intermediate coat thickness
Top coat thickness
Primer type
Intermediate coat type
Color number of the top coat
Supplier
Hempel
Issue 02 (2023-02-28)
NO TE
● The color of the repainted area must be consistent with that of the surrounding area.
Use a colorimeter to measure the color difference, which should be less than or equal to
3 (ΔE ≤ 3). If a colorimeter is unavailable, ensure that there is no visible edge between
the repainted area and the surrounding area. The paint should be free of bulges,
scratches, flaking, or cracks.
● If you choose to spray paint, it is recommended that you spray paint three times before
checking the result. If the color does not meet the requirements, paint more times until
the painting meets the requirements.
NO TE
The following is a paint model list provided by Huawei. The list may be updated from time
to time and is for reference only. The cost of paint and technical services is subject to the
local pricing standards.
Position
Equipment
surface painting
Copyright © Huawei Digital Power Technologies Co., Ltd.
Requirement
60 μm
120 μm
60 μm
Epoxy zinc-rich paint
Zinc-rich paint
Obtain the color number based on the
color palette delivered with the
product.
Paint Model
Zinc-rich primer for pretreatment:
HEMPADUR ZINC (shopprimer) 1536C/
19830
Zinc-rich primer for the entire container:
HEMPADUR ZINC (on line) 1536C/19830
Intermediate coat: HEMPADUR FAST DRY
15560/12170
Top coat: HEMPATHANE 55210/17630
(RAL9003)