LUNA2000-200KWH-2H1 Smart String ESS
Maintenance Manual
Follow-up Procedure
Step 1 Turn on the power switch of the air conditioner in the cabinet.
Step 2 Log in to the CMU, choose Maintenance > Connect Device > Remove Devices,
and remove the old air conditioner.
Figure 8-14 Removing the old air conditioner
Step 3 Click Auto. Search and add the new air conditioner.
Figure 8-15 Adding the new air conditioner
Step 4 Check whether the functions are restored.
Check Item
Alarm information
Function
Running data
----End
Issue 02 (2023-02-28)
Copyright © Huawei Digital Power Technologies Co., Ltd.
Criteria
No component communication alarm is generated.
The functions are normal.
Air conditioner status: normal operation
8 Replacing an Air Conditioner
100