Replacing An I/O Expansion Board - Huawei LUNA2000-200KWH-2H1 Maintenance Manual

Smart string ess
Hide thumbs Also See for LUNA2000-200KWH-2H1:
Table of Contents

Advertisement

LUNA2000-200KWH-2H1 Smart String ESS
Maintenance Manual
25
Context
Figure 25-1 Position of the I/O expansion board
Issue 02 (2023-02-28)

Replacing an I/O Expansion Board

Fault locating:
a.
Log in to the SmartLogger WebUI, CMU WebUI, FusionSolar app, or
management system to view alarm information.
b.
Refer to the alarm handling suggestions in the alarm list.
Tools: Phillips insulated torque screwdriver, insulated torque socket wrench
Power-off:
a.
Log in to the SmartLogger WebUI, CMU WebUI, FusionSolar app, or
management system and send a shutdown command to the rack
controller.
b.
Turn off the ESS output DC switch 1Q2.
c.
Turn off the ESS battery rack DC switch 1Q1.
Copyright © Huawei Digital Power Technologies Co., Ltd.
25 Replacing an I/O Expansion Board
147

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna2000-200kwh-100kw-2h1

Table of Contents