Replacing an I/O Expansion Board

Fault locating:
a.
Log in to the SmartLogger WebUI, CMU WebUI, FusionSolar app, or
management system and check alarms.
b.
Refer to the alarm handling suggestions in the alarm list.
Tools: Phillips insulated torque screwdriver and insulated torque socket
wrench
Power-off:
a.
Log in to the SmartLogger WebUI, CMU WebUI, FusionSolar app, or
management system and send a shutdown command to the rack
controller.
b.
Turn off the ESS output DC switch 1Q2.
Copyright © Huawei Digital Power Technologies Co., Ltd.
25 Replacing an I/O Expansion Board
148

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna2000-200kwh-2h1

Table of Contents