Power Limit Networking - Goodwe SDT Series User Manual

Grid-tied pv inverter
Hide thumbs Also See for SDT Series:
Table of Contents

Advertisement

06 Electrical Connection

6.5.2 Power Limit Networking

When all loads in the PV system cannot consume the generated electricity, the surplus power will
be fed into the grid. In this case, it is possible to monitor the power generation with an Smart
Meter, Smart DataLogger, or SEC1000 (smart energy controller) to control the amount of power
fed into the grid.
Power limit networking with single inveter ( GMK330)
Recommended cross-sectional area of the smart meter input power cable: 1mm
Inverter
-
+
Power limit networking with single inveter ( GM330)
NOTICE
BA
N L1
L2 L3
Load
Circuit
Breaker
N
34
User Manual V1.3-2024-01-25
CT3
L3
CT2
L2
CT1
L1
Meter
GMK330
1
1
2
2
RESET
RESET
L1 L2 L3
(18AWG).
2
N
Grid

Advertisement

Table of Contents
loading

Table of Contents